Advance rulings (AAR) Maharashtra

No GST Exemption on Freight Charges inside EPC Works Contracts

Turnkey EPC contractors cannot split freight charges from project contracts to claim road transport GST exemption.

Ruling
NO.GST-ARA-36/2017-18/B-43 dated 04.06.2018
Dated
04 Jun 2018
Authority
Authority for Advance Ruling

This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

The short version

  1. An EPC contractor asked if transport charges in solar projects are GST exempt.
  2. Non-GTA road transport of goods is normally exempt from GST.
  3. The authority ruled turnkey solar project work is an indivisible works contract.
  4. Freight charges within an EPC contract cannot be separated for exemption.
  5. Entire contract value attracts GST under works contract service rules.

In short

The contractor proposed undertaking turnkey solar power plant projects, including design, equipment procurement, freight, civil works, and commissioning. Under GST rules, ordinary transport of goods by road is exempt from tax unless provided by a Goods Transport Agency. The contractor argued that freight charges inside his project contracts should be exempt because he is not a registered transport agency. The tax authority had to decide whether a single turnkey contract can be split into separate parts to claim tax exemptions on transport.

What has changed

How it worked before

Before this ruling, many project contractors split their EPC agreements into separate items for equipment supply, civil work, and freight. They assumed that listing transportation separately allowed them to claim the general GST exemption on non-GTA road transport.

What has changed

The Maharashtra Authority for Advance Ruling held that a turnkey project to construct a solar power plant is a single works contract under section 2(119) of the CGST Act. Because the final output is an immovable structure, constituent activities like transport cannot be carved out as separate exempt services. As a result, contractors must pay full GST under works contract rules on the total project value, including transportation charges.

Who this affects

Engineering, procurement, and construction contractors executing turnkey solar power plants, transmission facilities, or infrastructure projects.

An example

Solar Systems Ltd signs a single turnkey contract to set up a solar power facility in Maharashtra. The contract lists separate costs for solar panels, civil foundations, and road transport of equipment. The company asks if it can exclude GST on the transport portion since it does not operate as a registered transport agency. Based on ruling GST-ARA- 36/2017-18/B- 43, the tax office will treat the entire contract as a single works contract and demand full GST on the transport charges too.

What you should do

Review your turnkey and EPC contracts to ensure GST is calculated on the total contract price. Do not split freight or insurance into separate invoices in an attempt to claim GST exemptions on a construction project. Remember that an advance ruling binds only the business that applied for it and its tax office, so this decision is not an automatic law for everyone. Consult a tax professional to evaluate your specific contract terms.

If you do nothing

If you exclude transport charges from GST on turnkey construction contracts, tax officers may reclassify your entire contract during an audit. They will demand the unpaid GST on the freight portion along with mandatory interest. You may also face penalties under GST law for underreporting tax liability.

The terms explained

works contract
A single contract for building, constructing, installing, or repairing an immovable property where goods are transferred as part of the work.
EPC contract
An Engineering, Procurement, and Construction agreement where one contractor handles complete design, equipment purchase, and project construction.
Goods Transport Agency (GTA)
A business that provides road transport for goods and issues a formal consignment note for the shipment.
composite supply
A bundle of two or more goods or services supplied together, where one main service gives the overall transaction its principal purpose.

The ruling in detail

Authority for Advance Ruling

Dinesh Kumar Agrawal

NO.GST-ARA-36/2017-18/B-43 dated 04.06.2018 · Maharashtra

Questions before the authority

  • Whether Standalone Contract of transportation merits classification under Service code 9965 and whether same is exempt under Entry No. 18 of Notification No. 12/2017-Central Tax (Rate) dated 28 June 2017?
  • Whether composite supply of transportation and insurance merits classification under Service code 9965 and whether same is exempt under Entry No. 18 of Notification No. 12/2017-Central Tax (Rate) dated 28 June 2017?
  • Whether composite supply of 'loading of goods at the premises of the supplier, transportation in own/hired trucks to the project site, unloading and handling of goods at project site and in-transit insurance' merits classification under Service code 9965 and whether same is exempt under Entry No. 18 of Notification No. 12/2017-Central Tax (Rate) dated 28 June 2017?
  • Whether supply of services namely 'loading of goods at the premises of the supplier, transportation in own/hired trucks to the project site, unloading and handling of goods at project site and in-transit insurance' under Service Contract (under Split Contract) merits classification under Service code 9965 and whether same is exempt under Entry No. 18 of Notification No. 12/2017-Central Tax (Rate) dated 28 June 2017?
  • Whether supply of services namely 'loading of goods at the premises of the supplier, transportation in own/hired trucks to the project site, unloading and handling of goods at project site and in-transit insurance' under EPC Contract merits classification under Service code 9965 and whether same is exempt under Entry No. 18 of Notification No. 12/2017-Central Tax (Rate) dated 28 June 2017?
  • Whether transportation charges received by the applicant are liable to GST, specially when the applicant is not a goods transport agency (GTA)?

Facts

The applicant, an individual contractor, proposed to undertake turnkey Engineering, Procurement, and Construction (EPC) projects for solar power plants and transmission facilities. The scope of work encompassed design, equipment procurement, transportation, transit insurance, storage, civil works, erection, and commissioning. The applicant submitted draft EPC contracts and claimed that transportation charges should be exempt from GST under Entry No. 18 of Notification No. 12/2017-Central Tax (Rate) because he is not a Goods Transport Agency (GTA) and does not issue consignment notes.

Ruling

QuestionWhat the authority ruled
Liability to GST on transportation charges received by non-GTA contractor under EPC contractAnswered in the affirmative; taxable as a **works contract** under section 2(119)
Applies to single indivisible EPC contracts resulting in immovable property

The Authority held that the proposed EPC agreement is a single, indivisible contract for solar power plant construction, constituting a composite supply of a **works contract** under section 2(119) of the CGST Act. The transportation of equipment cannot be carved out as a standalone service or isolated exempt supply. Consequently, transportation charges received by the applicant under the EPC contract are liable to GST as part of the works contract service.

Reasoning

The Authority analyzed the terms of the draft EPC agreement as a whole and noted that the applicant's single-point responsibility covers design, equipment supply, freight, civil foundation work, installation, testing, and commissioning. The resulting solar power plant involves civil structures and is intended to function as an immovable property at the project site. Following Supreme Court rulings on immovable property, the transaction qualifies as a works contract under section 2(119) of the CGST Act. Because the supply is an integrated works contract, individual activities like transportation cannot be split up to seek exemption under Entry No. 18 of Notification No. 12/2017-Central Tax (Rate).

Provisions relied on

  • Section 2(119) of the CGST Act, 2017
  • Section 2(30) of the CGST Act, 2017
  • Entry No. 18 of Notification No. 12/2017-Central Tax (Rate) dated 28 June 2017
  • Section 97 of the CGST Act, 2017 / MGST Act, 2017
  • Section 98 of the CGST Act, 2017 / MGST Act, 2017

For the practitioner

An EPC contractor carrying out turnkey projects cannot artificially segregate freight charges to claim the GST exemption available to non-GTA transporters. Where the overarching contract involves erection, installation, and civil work yielding an immovable structure, all constituent activities are treated as part of a single **works contract**. Furthermore, advance ruling authorities will decline to rule on hypothetical standalone or split contract structures unless actual draft agreements for those arrangements are produced.

Source

This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

Original order: https://www.gstcouncil.gov.in/sites/default/files/AAR/mah_aar_36_2017-18_b-43_04.06.2018_dka.pdf

Legibility of the scan, as read: high.

Prepared 18-10-2026.

About Patron Accounting LLP

Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

We operate from five offices and serve clients across the rest of India remotely:

  • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
  • Mumbai: 104, Rajshila Building, 597 J.S.S. Road, Marine Lines, Mumbai 400002
  • Delhi: 3rd Floor, B-6/154-155, Sector 5, Rohini, Delhi 110085
  • Gurugram: Pioneer Urban Square, B109, Golf Course Ext Road, Sector 62, Gurugram 122098
  • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

Can I claim GST exemption on transport charges if I am not a transport agency?

You can only claim this exemption if transport is a genuine standalone service. If freight is part of a turnkey construction project, GST applies to the entire contract value.

Is this advance ruling automatically binding on my business?

No. An advance ruling binds only the specific business that asked for it and its local tax authority. However, tax officers often follow these decisions when auditing similar project contracts.

What if my EPC contract lists transport as a separate line item on the invoice?

Tax officers look at the underlying contract rather than invoice lines. If the core agreement is to deliver an immovable plant, breaking up invoice lines will not qualify you for a GST exemption.

Can I split a project into separate equipment and civil contracts to save GST?

Splitting contracts requires genuine independent legal agreements executed separately. The advance ruling authority refused to grant exemptions in this case because the underlying arrangement remained a single turnkey project.

What happens if a tax officer disagrees with how I billed my freight charges?

The tax officer can issue a demand notice reclassifying the contract as a works contract. You will then have to pay the missing GST along with interest and potential penalties.