    Solar plant turnkey contract taxed as works contract at 18% GST

    Rajasthan's appellate authority held that a turnkey solar plant contract is a works contract taxed at 18% GST, not 5%.

    Ruling
    ORDER NO. RAJ/AAAR/4/2018-19 DATED 29.11.2018 (the date stamp is partly handwritten; the listing gives 29.11.2018)
    Dated
    Authority
    Appellate Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. The contract covered modules, civil work, erection, electrical work and commissioning for one lump-sum price
    2. The authority treated the whole contract as one composite supply of services
    3. The plant was held to be immovable property because it is fixed on foundations
    4. Because it is a works contract, the authority taxed it at 18% and did not accept 5%
    5. The ruling binds only the company that asked and its own tax office

    In short

    The company asked whether one contract to supply, install and commission a solar power plant counts as a supply of goods or services under GST, and which rate applies. The answer decides whether the contractor pays 5% or 18% on the whole price.

    What has changed

    How it worked before

    The position was not settled. The company itself claimed the 5% rate that applies to solar power generating systems on the whole contract, so contractors could reasonably have taken the same view.

    What has changed

    The authority held that a turnkey contract covering supply, erection and commissioning of a ground-mounted solar plant is a works contract. Works contracts for immovable property are supplies of services and taxed at 18%. The authority did not reach the separate question of principal supply.

    Who this affects

    EPC contractors and turnkey builders who sign single lump-sum contracts to build solar power plants fixed on foundations, where the contract includes both equipment and construction work.

    An example

    A contractor signs a lump-sum contract with a landowner to supply modules and inverters, lay concrete foundations, erect the structures and commission a plant. The contractor may ask whether it can charge 5% on the equipment and 18% on the construction. This ruling suggests that where everything sits in one contract and the plant is fixed to the ground, the whole price may be treated as a works contract at 18%.

    What you should do

    Do not apply the 18% rate automatically. This is an advance ruling, so it binds only the company that asked and its own tax office. Other contractors should check their own contract scope, how the plant is fixed, and the rate notifications, and where unsure, seek an advance ruling of their own or advice from a tax professional.

    If you do nothing

    If you charge 5% on a contract that a tax officer treats as a works contract, you may be asked to pay the shortfall with interest and possibly a penalty. Assuming this ruling covers you when your plant or contract differs can leave you with a tax demand you did not plan for.

    The terms explained

    composite supply
    A supply where several goods and services are bundled together in the normal course of business, and one main item drives the tax treatment of the whole package.
    works contract
    A contract to build, install or construct something on immovable property, where both materials and labour are supplied under one price.
    EPC contract
    Engineering, procurement and construction contract, where one contractor designs, supplies equipment for and builds a project, often for a fixed price.
    immovable property
    Property that cannot be moved without damage, such as land and structures permanently fixed to it. Whether a plant counts as immovable depends on how it is fixed and the parties' intent.
    advance ruling
    A decision by a GST authority on one business's specific question, which binds only that business and its own tax office.

    The ruling in detail

    Appellate Authority for Advance Ruling

    RFE Solar Private Limited, D-43, Janpath, Shyam Nagar, Jaipur, Rajasthan, 302019 (appellant; GSTIN 08AAICR3819D1ZE)

    ORDER NO. RAJ/AAAR/4/2018-19 DATED 29.11.2018 (the date stamp is partly handwritten; the listing gives 29.11.2018) · Rajasthan

    Questions before the authority

    • Whether a contract for erection, procurement and commissioning of a Solar Power Plant is classifiable as a supply of goods or a supply of services under the CGST Act, 2017 and the Rajasthan GST Act, 2017.
    • If it is a supply of goods, what is its HSN classification and rate of tax under Notification No. 1/2017-Central Tax (Rate).
    • If it is a supply of services, what is its HSN classification and rate of tax under Notification No. 11/2017-Central Tax (Rate).

    Facts

    The appellant, an EPC contractor, undertakes turnkey contracts to build Solar Power Generating Systems. The contract in question, with Kushtagi Solar Power Private Limited as owner, covers a 15 MWac / 21 MWdc plant in Karnataka. Its scope includes supply of modules, inverters, structures and other equipment, civil and foundation works, erection, electrical work, commissioning, and obtaining approvals, for a single lump-sum price.

    Ruling

    QuestionWhat the authority ruled
    Whether the turnkey EPC contract for a solar power plant is a supply of goods or of servicesComposite supply that is a works contract, i.e. a supply of services (SAC 9954)
    The authority differed from the AAR on the composite-supply characterisation but agreed with its works contract conclusion. The plant was treated as immovable property.
    Rate of tax on the contract18% (9% CGST and 9% RGST, or 18% IGST)
    The appellant's contention that the principal supply is solar goods taxable at 5% under Notification 1/2017 entry 234 was rejected.
    Principal supply and the 5% claimNot decided
    No occasion arose to examine principal supply, since Para 6 of Schedule II treats works contracts as supply of services.

    The Appellate Authority held that the turnkey EPC contract is a **composite supply** under section 2(30) of the CGST Act. It falls within the definition of **works contract** under section 2(119), which makes it a supply of services (SAC 9954) taxable at **18%**. Because the transaction is a works contract, the authority did not reach the question of principal supply and did not accept the appellant's claim for 5% GST.

    Reasoning

    The authority first found the contract to be a composite supply of goods and services that are naturally bundled in the ordinary course of business, applying the indicators in the CBIC e-flier. It then held that the plant, fixed on foundations with extensive civil and groundwork, is immovable property. That follows from the permanence of embedding and the intention of the parties, relying on Duncans Industries and T.T.G. Industries, and not on the appellant's reliance on the General Clauses Act and Sirpur Paper Mills. Since the activities relate to immovable property, the contract is a works contract under section 2(119). Para 6(a) of Schedule II treats such a contract as a supply of services, which made the principal-supply question unnecessary.

    Provisions relied on

    • Section 2(30) CGST Act, 2017 (composite supply)
    • Section 2(74) CGST Act, 2017 (mixed supply)
    • Section 2(90) CGST Act, 2017 (principal supply)
    • Section 2(119) CGST Act, 2017 (works contract)
    • Section 2(52) and Section 2(102) CGST Act, 2017 (goods and services definitions)
    • Section 7(1)(d) and Schedule II, Para 6(a) CGST Act, 2017
    • Section 3(26) General Clauses Act, 1897 (immovable property)
    • Notification No. 1/2017-Central Tax (Rate), entry 234 (solar power generating system, cited by the appellant)
    • Notification No. 11/2017-Central Tax (Rate), SAC 9954 (works contract services)
    • CBEC Order No. 58/1/2002-CX (cited by the appellant on excisable goods and immovable property)
    • Section 37B Central Excise Act (under which the CBEC order was issued)

    For the practitioner

    Practitioners advising on solar EPC or turnkey plant contracts can cite this order for the proposition that a single contract covering supply, erection and commissioning of a ground-mounted solar plant is treated as a works contract taxed at 18%, not at 5%. Because the order is an appellate ruling, it binds only the applicant, though it is persuasive for similar contracts. It does not decide the rate for a standalone supply of solar modules or devices, nor does it resolve the principal-supply question. Its immovability findings are fact-specific, so a different plant layout or a movable installation may lead to a different result.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/2024-02/aaar-raj-4-2018_dtd._29.11.18_rfe_solar.pdf

    Legibility of the scan, as read: high.

    Prepared 27-10-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Appellate orders (AAAR)

    All Appellate orders (AAAR) →

    Does this mean my solar plant contract is also taxed at 18%?

    Not automatically. The ruling is based on this contract's scope, a ground-mounted plant on foundations, and the parties' intent. Check whether your contract covers the same work and how your plant is fixed before applying the same treatment.

    Is this ruling binding on other businesses or other states?

    No. It binds only RFE Solar (P) Ltd. and its own tax office in Rajasthan. Other businesses can cite it as persuasive, but a tax officer in any state is not bound by it.

    Can I still charge 5% on solar modules I supply on their own?

    The ruling does not decide the rate for a standalone supply of solar modules or devices. It only covers a single contract for supply, erection and commissioning of a plant.

    What if my plant is on a rooftop or a movable frame?

    The ruling's findings on immovability are specific to this plant. A different layout or a movable installation may lead to a different result, so the 18% treatment should not be assumed.