    Power utility's connection and meter charges taxable under GST, Andhra ruling

    The Appellate Authority held that a power utility's connection, meter and contractor-built works are taxable under GST, not exempt.

    Ruling
    Order /AAAR/AP/05(GST)/2019 in Application No. AAAR/11(GST)/2019, dated 11th December 2019 (Appellate Authority for Advance Ruling, Andhra Pradesh)
    Dated
    Authority
    Appellate Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. Order AAAR/AP/05(GST)/2019, dated 11 December 2019, upholds an advance ruling for APSPDCL.
    2. Connection, reconnection, meters, poles, lines and supervision are not part of the exempt electricity supply.
    3. Contractor-executed works do not inherit the utility's exemptions or nil rate.
    4. Grant-funded utility works were held commercial, so the 12% concessional rate was refused.
    5. The nil rate for tube-well extension applies only to the distribution utility itself.

    In short

    Under the Goods and Services Tax (GST), Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL), a state-owned electricity distributor, asked whether its connection, meter and network works qualify for the exemption for electricity transmission and distribution. The company also asked whether works done through contractors, grant-funded rural schemes and tube-well connections could get the 12% concessional rate or the nil rate. The question was whether these extra services share the tax treatment of the electricity supply itself.

    What has changed

    How it worked before

    Distribution utilities and their contractors could reasonably have assumed that services linked to electricity supply shared its exemption. For contractor-run and grant-funded works, the position was not settled, and the order does not describe how businesses generally treated them.

    What has changed

    The authority held that connection, reconnection, supervision, poles, sub-stations, lines and meters are not naturally bundled with electricity supply, so they are taxable. This applies whether the utility supplies them directly or through contractors and third parties. Works funded by central grants were still held commercial, because they were promoted to make the utility commercially viable, so the 12% concessional rate was refused. The nil rate for tube-well extension was limited to the electricity distribution utility itself and does not extend to contractors.

    Who this affects

    Electricity distribution companies, state power utilities, and their contractors doing rural electrification or grant-funded network work. It also matters for any business that charges connection fees, meter rent or testing fees alongside a supply of electricity.

    An example

    A contractor builds distribution lines for a state utility under a central rural electrification scheme. The contractor asks whether its work carries the utility's nil rate for electricity distribution. This ruling suggests it does not, because the exemption belongs to the utility and does not pass to contractors. The contractor should check its tax position on its own contract rather than rely on the utility's status.

    What you should do

    Do not treat this order as settled law for your business. A ruling of this kind binds only the company that asked and its own tax office, so APSPDCL and its jurisdictional officer are bound, but your tax office is not. Review which of your own charges and contracts are similar, and if you are unsure, seek an advance ruling on your own facts before you assume the same treatment.

    If you do nothing

    If you assume this ruling covers you and it does not, a tax officer may demand the tax you did not charge, along with interest and possibly penalty. Your business would then bear the cost of the tax, the interest and the dispute itself. Checking the treatment of your own services before invoicing avoids this exposure.

    The terms explained

    advance ruling
    A decision by a tax authority on a specific business's question about how a tax applies, given before the business acts. It binds the business that asked and its own tax office, not other businesses.
    composite supply
    A supply where several items are provided together and one of them is the main part. Here the question was whether connection and meter services are part of the electricity supply or separate.
    concessional rate
    A lower GST rate that applies to certain supplies because of who supplies them or for what purpose. The order held that the 12% rate was not available for these works.
    input tax credit
    The tax a business has already paid on its purchases, which it may set off against the GST it owes on its own supplies. The order does not decide any question on this point.

    The ruling in detail

    Appellate Authority for Advance Ruling

    M/s Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL / Discom), GSTIN 37AAHCS4056Q2ZM

    Order /AAAR/AP/05(GST)/2019 in Application No. AAAR/11(GST)/2019, dated 11th December 2019 (Appellate Authority for Advance Ruling, Andhra Pradesh) · Andhra Pradesh

    Questions before the authority

    • Are connection, re-connection, supervision of works, erection of poles, sub-stations and transmission lines, and supply of meters, provided to consumers during the supply of electricity, naturally bundled with, and part of, the composite supply of electrical energy?
    • Can those same services be treated as part of the principal supply of transmission or distribution of electricity, which is exempt?
    • Are those supplies, made through contractors and third parties, also exempt as part of transmission or distribution or sale of electrical energy?
    • If not, are works under DDUGJY, IPDS and RAPDRP executed through contractors liable to GST at 12%, since they are funded by central grants and are non-commercial?
    • If not, are Agricultural Demand Side Management (AGL) works liable to GST at 12%, since they are non-commercial?
    • Are supplies made through contractors for extending distribution networks up to farm tube wells exempt under Notification No. 14/2018-Central Tax (Rate) dated 26.07.2018?

    Facts

    APSPDCL is a state-owned distribution licensee under the Electricity Act, 2003. Besides supplying electricity, it grants connections and reconnections, supplies meters, builds and maintains distribution and transmission networks, and supervises works executed by contractors, including rural electrification works under central and state schemes. Some of these works are funded by central grants or by REC loans. The question is whether these ancillary services and contractor-executed works attract the exemption for transmission or distribution of electricity, the 12% concessional rate, or the nil rate for tube-well connections.

    Ruling

    QuestionWhat the authority ruled
    Ancillary services (connection, reconnection, supervision, erection of poles, sub-stations, lines, meters) as part of exempt electricity supplyNot exempt. Taxable.
    Not naturally bundled under section 2(30) of the CGST Act, since they are supplied only on consumer demand. Taxable whether supplied by APSPDCL, contractors or third parties. Agrees with the AAR.
    DDUGJY, IPDS and RAPDRP works executed through contractors, claimed at 12% GST12% not available. Rate applicable is 18% (9% CGST and 9% SGST).
    APSPDCL is a Government entity under Notification No. 31/2017-Central Tax (Rate) dated 13.10.2017, but the works are for commercial purpose, so the entry in Notification No. 24/2017-Central Tax (Rate) dated 21.09.2017 does not apply.
    AGL works claimed at 12% GST as non-commercial12% not available.
    The order treats this together with the DDUGJY, IPDS and RAPDRP question, applying the same commercial-purpose reasoning.
    Tube-well extension works through contractors under Notification No. 14/2018-Central Tax (Rate) dated 26.07.2018, entry 10ANil rate not available to contractors. Works taken up by contractors are taxable.
    Entry 10A covers only services supplied by electricity distribution utilities. An exemption notification is not extended to contractors working on the utility's behalf.

    The Appellate Authority dismissed the appeal and upheld the Advance Ruling of the AAR. It held that the ancillary services are not naturally bundled with the supply of electricity and are taxable whether supplied directly or through contractors or third parties. It held that the 12% concessional rate is not available because the works are for a commercial purpose, notwithstanding APSPDCL's status as a Government entity. It held that the nil rate for tube-well extension applies only to the electricity distribution utility itself and does not extend to contractors.

    Reasoning

    The authority read section 2(30) of the CGST Act and found that the ancillary services are supplied and charged only when the consumer demands them, so they are not naturally bundled with electricity supply. It therefore refused to extend the nil rate for transmission and distribution to them. It relied on the CBIC clarification in Circular No. 34/8/2018-GST, which treats DISCOM charges such as connection fees, meter rent and testing fees as taxable. On the concessional rate, it held that the works, though grant-funded, were promoted to make APSPDCL commercially viable, so they are not non-commercial works under entry (vi) of Notification No. 24/2017. On entry 10A it held that the exemption is confined in plain terms to electricity distribution utilities. The order does not discuss the Gujarat High Court decision in Torrent Power or the section 8(a) argument that the appellant relied on.

    Provisions relied on

    • Section 2(30) of the CGST Act (composite supply definition)
    • Notification No. 12/2017-Central Tax (Rate) dated 28.06.2017, entry 25 (heading 9969, nil rate) and Sl. No. 10A (as referred to in the AAR ruling)
    • Notification No. 11/2017-Central Tax (Rate) dated 28.06.2017 (heading 9954, 18% rate)
    • Notification No. 24/2017-Central Tax (Rate) dated 21.09.2017, entry (vi) (12% concessional rate for government construction for non-commercial works)
    • Notification No. 31/2017-Central Tax (Rate) dated 13.10.2017 (Government entity status)
    • Notification No. 14/2018-Central Tax (Rate) dated 26.07.2018, entry 10A (nil rate for tube-well extension by electricity distribution utilities)
    • CBIC Circular No. 34/8/2018-GST, F. No. 354/17/2018-TRU, Sl. No. 4 (DISCOM charges taxable)

    For the practitioner

    This order is useful for distribution utilities and their contractors on two points. Ancillary charges such as connection, meter rent and testing fees are taxable even though electricity supply is exempt, and contractor-executed works do not inherit the utility's exemptions. The order also confirms that grant-funded utility works are not automatically non-commercial for the 12% rate. It does not decide the Torrent Power point raised on judicial discipline, and it does not resolve the section 8(a) principal-supply argument. Those points may still be open in further proceedings.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/2024-02/ap_aaar_05_2019_11.12.2019_spdcapl.pdf

    Legibility of the scan, as read: medium.

    Prepared 15-11-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Appellate orders (AAAR)

    All Appellate orders (AAAR) →

    Does this mean my company's connection and meter charges are taxable too?

    The ruling binds only APSPDCL and its tax office. However, the reasoning turns on the nature of these services, so a similar business may find the authority would reach the same view. Check your own services against it.

    Does a contractor working for a power utility get the utility's exemption?

    The order says no. The nil rate for electricity distribution applies to the utility itself, and contractor-executed works are taxed on their own terms.

    Are grant-funded government works automatically non-commercial for the 12% rate?

    No, according to this order. The works were held commercial because they were promoted to make the utility commercially viable, so the 12% concessional rate was refused.

    Did the order decide the Torrent Power point?

    No. The order does not discuss the Gujarat High Court decision in Torrent Power or the section 8(a) principal-supply argument, so those points remain open.

    What if my tax officer disagrees with this reading?

    The order does not bind your tax office, so your officer may still question your treatment. Where you disagree, the matter is decided on your own facts, and an advance ruling for your business can settle the point for you.