    GST input tax credit denied on plant road and boundary lighting, NMDC order

    The appellate authority refused GST input tax credit on NMDC's plant road, boundary wall and watchtower lighting, treating it as civil structures, not plant and machinery.

    Ruling
    No. STC/AAAR/03/2019/78 dated 03/09/2019 (as printed on page 1). The operative order on page 27 bears No. STC/AAAR/03/2019/79, with the date partly overwritten and not clearly legible. The listing's reference 'CG/AAAR/03/2019-20' does not match the document.
    Dated
    Authority
    Appellate Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. NMDC asked whether GST input tax credit applies to plant road, boundary and watchtower lighting.
    2. The authority said the lighting is an immovable civil structure on foundations, not plant and machinery.
    3. Credit on the works contract and construction costs was denied under section 17(5)(c) and (d).
    4. The authority found no link between this lighting and NMDC's outward supply of steel.
    5. The order binds only NMDC and its own tax office.

    In short

    This order is about whether GST input tax credit can be claimed on the cost of lighting a large factory site. NMDC Limited, which is building a steel plant at Nagarnar in Chhattisgarh, hired a contractor to design, supply and erect lighting for its plant road, boundary wall and watchtower, at a contract price of about Rs. 19.2 crore. It asked whether the GST paid on that design, supply and erection could be set off as input tax credit.

    What has changed

    How it worked before

    The position was unsettled. Businesses building lighting on factory roads, boundaries or perimeters had no clear rule on whether the GST paid could be claimed back. The order itself refers to a Delhi High Court decision on telecom towers, which this authority held concerned output services and did not decide the question here.

    What has changed

    The authority refused credit on all three parts of the NMDC work: design and engineering, supply of poles and fittings, and erection. It held that the installation is an immovable civil structure, not plant and machinery, so the exception for plant and machinery did not save the claim. It also held that NMDC had not shown the lighting was linked to making its outward supply, which is the link the exception requires. In practice, a business that builds perimeter or road lighting on concrete foundations should expect the department to deny credit on the works contract and construction costs unless it can show a clear link to making its sales.

    Who this affects

    Factories, steel and mining plants, and other large sites that install road, boundary, perimeter or watchtower lighting on concrete foundations through a works contract.

    An example

    A cement company builds lighting for its internal haul road and the boundary wall around its quarry, under a single contract with an electrical contractor. Its accountant asks whether the GST on the contractor's bill can be claimed as input tax credit. This order suggests the answer is likely no for road and boundary lighting on concrete foundations, unless the company can show the lighting directly serves the making of its taxable supply.

    What you should do

    Check whether your lighting work is structured like this one: a works contract, fixed foundations, and a scope that serves the site rather than a production line. Do not assume credit is available because this ruling was in your favour or against you; an advance ruling binds only the business that asked for it and its own tax office. If your facts differ, seek an advance ruling of your own or get written advice on your specific contract before claiming credit.

    If you do nothing

    If you claim input tax credit on lighting work that this order would deny, a tax officer can disallow the credit and demand it back with interest. The officer may also impose a penalty for a wrong claim. The cost of being wrong is usually the full GST amount plus interest, which can be large on a contract of this size.

    The terms explained

    advance ruling
    A written decision by a GST authority on one business's question before it acts. It binds only the business that asked and its own tax office.
    works contract
    A contract where a contractor does construction, installation or similar work on property, usually supplying materials and labour together.
    plant and machinery
    Apparatus fixed to the ground and used to make a business's taxable sales. Under GST, credit on construction for this kind of asset can be allowed, but only if the conditions are met.
    outward supply
    The goods or services a business sells or supplies to others, which is the output that GST is charged on.

    The ruling in detail

    Appellate Authority for Advance Ruling

    M/s NMDC Limited, Bacheli, Dantewada (South Bastar), Chhattisgarh, through Shri P.K. Mahapatra, Assistant General Manager (Finance). GSTIN is printed as 22AAACN7325A3Z3 on most pages; page 1 prints 22AAACN7325A1Z5.

    No. STC/AAAR/03/2019/78 dated 03/09/2019 (as printed on page 1). The operative order on page 27 bears No. STC/AAAR/03/2019/79, with the date partly overwritten and not clearly legible. The listing's reference 'CG/AAAR/03/2019-20' does not match the document. · Chhattisgarh

    Questions before the authority

    • Whether input tax credit can be availed on design and engineering of lighting for plant road, boundary wall and watchtower.
    • Whether input tax credit can be availed on supply of plant and equipment for lighting of plant road, boundary wall and watchtower.
    • Whether input tax credit can be availed on erection of plant and equipment for lighting of plant road, boundary wall and watchtower.

    Facts

    NMDC is setting up a 3 MTPA greenfield integrated steel plant at Nagarnar, Chhattisgarh, which runs round the clock. It awarded Package 33, the lighting of the plant road, boundary wall and watchtower, to M/s Bajaj Electricals Ltd under a contract dated 10.03.2017 with a total price of about Rs. 19.2 crore. The scope covers design and engineering, supply of poles, fittings, lamps, switch boxes and cable pipes, and their erection, along with civil foundations for the structures.

    Ruling

    QuestionWhat the authority ruled
    Design and engineering of lighting for plant road, boundary wall and watchtowerInput tax credit not available. AAR ruling upheld.
    The order disposes of all three questions together and gives no separate per-question reasoning. The denial rests on the immovable-structure finding and the lack of outward-supply nexus.
    Supply of plant and equipment for lighting of plant road, boundary wall and watchtowerInput tax credit not available. AAR ruling upheld.
    Same basis as the design item. The order holds the items are civil structures with foundations, not plant and machinery.
    Erection of plant and equipment for lighting of plant road, boundary wall and watchtowerInput tax credit not available. AAR ruling upheld.
    Same basis as the other items. The erection work is treated as construction of immovable property under section 17(5)(c) and (d).

    The Appellate Authority held that the three items are denied input tax credit because the lighting installation is an immovable civil structure, not plant and machinery, and the works contract and construction restrictions in section 17(5)(c) and (d) therefore apply. It also held that the nexus with outward supply was not established. The appeal was dismissed and the AAR's ruling of 24.04.2019 was upheld.

    Reasoning

    The Appellate Authority accepted that the test of movability is not decisive but held that the items fail the definition of plant and machinery, which requires apparatus fixed to earth that is used for making outward supply. It treated the lighting system as civil structures on foundations, relying on the contract's scope, the price schedule and the Supreme Court's decisions in TTG Industries and Duncans Industries on what is immovable. It found no nexus between the lighting and outward supply, so the exclusion of construction from section 17(5)(c) and (d) could not be invoked. It distinguished the Delhi High Court's Vodafone decision on telecom towers, which concerned output services, and the cited Cenvat capital goods cases as arising under the repealed regime.

    Provisions relied on

    • Section 100(1) of the CGST Act, 2017 (appeal)
    • Section 101 of the CGST Act, 2017 (appellate advance ruling)
    • Section 16(1) of the CGST Act, 2017 (eligibility of credit)
    • Section 17(5)(c) and (d) of the CGST Act, 2017 (works contract and construction of immovable property)
    • Explanation to section 17 of the CGST Act, 2017 (definition of plant and machinery and its exclusions)
    • Explanation to section 17(5) (meaning of construction)
    • Section 2(19), 2(59), 2(83) and 2(119) of the CGST Act, 2017 (capital goods, input, outward supply, works contract)
    • Section 103(1) of the CGST Act, 2017 (binding effect of advance rulings)
    • Section 3(26) of the General Clauses Act, 1897 and section 3 of the Transfer of Property Act, 1882 (immovable property)
    • CBIC Circular No. 58/1/2002-CX dated 15.01.2002 (as referred to in the impugned order)

    For the practitioner

    This is a useful appellate authority ruling for any taxpayer building plant-road, boundary or perimeter lighting on concrete foundations, since it treats such installations as civil structures and denies credit on their works contract and construction costs. It confirms that the plant and machinery exception needs a clear outward-supply nexus, not just a functional link to plant operations. It does not decide whether lighting fittings or poles inside a factory that directly serve production qualify, and it does not reconcile the Vodafone and Bharti Airtel line of cases in any depth. The order also notes that an advance ruling binds only the applicant.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/2024-02/cg_aaar_03_2019-20_03.09.2019_nmdc.pdf

    Legibility of the scan, as read: medium.

    Prepared 07-11-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Appellate orders (AAAR)

    All Appellate orders (AAAR) →

    Does this order mean I cannot claim input tax credit on any factory lighting?

    Not necessarily. The order concerns road, boundary and watchtower lighting on concrete foundations that the authority treated as civil structures. Lighting that directly serves production may be treated differently, and the order does not decide that question.

    Is this ruling binding on other businesses in Chhattisgarh or elsewhere?

    No. The order binds only NMDC Limited and its own tax office. Other businesses can read it to understand how the department views such work, but it is not automatically the law for them.

    What if my tax officer disagrees with my claim for lighting credit?

    The officer can disallow the credit and demand the tax back with interest. You can contest the demand through the appeal process, and you can also rely on the reasons in this order, though it will not bind the officer on your facts.

    Does the NMDC order cover the design and engineering charges in my lighting contract?

    The authority refused credit on the design and engineering part of NMDC's contract as well as the supply and erection parts. If your contract separates these charges, check whether your lighting is of the same kind before applying the same reasoning.