Reporting it inside work in progress
A countable group becomes one that needs completion estimates.
Stock audit glossary · Manufacturing stock
noun · also “subassembly” or “intermediate assembly”
Sub-assembly stock is components already built into a complete intermediate unit, held for later use in a larger assembly. Unlike work in progress, it is finished at its own level rather than partway through an operation, so it can be counted in whole units and carried at a known cost instead of an estimated stage of completion.
Meaning
Between raw components and the finished product sits stock that is complete in itself but still an input to something larger. A motor built and tested, a wiring harness assembled or a pump ready to fit is a finished item waiting to become part of another. It is held on purpose, not caught in the middle of a process.
That completeness separates it from work in progress and makes counting and costing simpler. A sub-assembly either exists or it does not, so it is counted in whole units; every operation on it is finished, so its cost is known. Work in progress needs a stage of completion and a share of cost, and both can be argued over. Where a business holds a large sub-assembly balance, the questions that matter are about age and obsolescence, not about how far through the process anything is.
Where it is used
Wherever a product is built in stages.
In practice
And built into the unit through a set sequence of operations.
Under its own part number, as a complete item.
Material, labour and overhead for every operation are known, so a known cost attaches.
Then issued like a purchased component.
Units built for a product that has been dropped have nowhere to go and are picked out for a value review.
Worked example
Sample figures.
| Level and item | Quantity × value each | Total (INR) |
|---|---|---|
| Raw material · sheet, bar, castings | Mixed lots | 62,00,000 |
| Sub-assembly · gearbox, built and tested | 340 × 18,400 | 62,56,000 |
| Sub-assembly · control panel, wired | 290 × 9,700 | 28,13,000 |
| Finished goods · complete machine | 74 × 1,84,000 | 1,36,16,000 |
A tested gearbox is neither raw material nor a finished machine. If the records only know those two states, its 62,56,000 either disappears or is counted at raw material value.
Sub-assemblies also carry labour and overhead, so they cannot be valued from the purchase ledger alone. On a rack, a tested gearbox looks much like one still being worked on, so completeness is checked before it is counted as finished.
Watch out
Most errors come from treating finished units as unfinished.
A countable group becomes one that needs completion estimates.
Every operation is done and the cost is known.
Units for a discontinued product stay at full cost.
Units missing a part are recorded as finished.
This is how the obsolete part of the balance grows.
Units complete on paper need rework before use.
Questions
A gearbox that is built and tested before being fitted into a machine is a sub-assembly. Other examples are a wired control panel, a wiring harness, or a populated circuit board waiting to go into its casing.
An assembly is the larger unit or the finished product. A subassembly is a complete unit at its own level that is built to become part of that larger assembly. A gearbox is a subassembly; the complete machine it goes into is the assembly.
Common alternatives are “intermediate assembly”, “module” and “sub-unit”. In stock records it may also be called a semi-finished or intermediate part, held under its own part number.
Both forms are used: “subassembly” as one word and “sub-assembly” with a hyphen. They mean the same thing; what matters is using one form consistently within a document or a set of stock records.
Patron Accounting LLP. This page makes no regulatory statement.
Sources: general manufacturing, costing and stock-count practice; no statutory statement is made on this page. General information, not professional advice.
Need help with sub-assembly stock? See our stock audit service. A stock audit counts each level separately.