    GST advance ruling: ISRO test facility EPC contract treated as works contract

    The Tamil Nadu authority held that an EPC contract installing ISRO test equipment is a works contract, so the 5% goods rate does not apply.

    Ruling
    Order No.17 / AAR / 2019 dated 16.04.2019
    Dated
    Authority
    Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. Tata Projects Limited asked whether its ISRO fluids system contract could be taxed at 5% GST.
    2. The authority accepted that the contract is a composite supply of goods and services.
    3. Erection and commissioning fixed the system to the test facility, making it immovable property.
    4. Because of this, the contract was treated as a works contract under Section 2(119).
    5. The 5% goods-rate notification could not apply, and the order does not state the rate that does.

    In short

    A GST advance ruling is a decision by a tax authority on one company's question before it does the work. Tata Projects Limited had a 27-month contract with ISRO's Propulsion Complex to design, supply, install and commission a fluids servicing system. The company argued that the main supply, the equipment, should be taxed at 5% under Notification No.45/2017-Central Tax (Rate). The question was whether that lower rate could apply to the whole contract.

    What has changed

    How it worked before

    Many contractors supplying equipment for government projects assumed that the goods portion could be taxed at the lower goods rate. Where equipment was installed, the treatment was often unclear, so businesses could not be sure which rate applied to the whole contract.

    What has changed

    The authority first held the contract to be a composite supply, which means goods and services bundled together. It then held that installing and commissioning the system made it immovable property, so the contract is a works contract. Under the GST law, works contracts are treated as a supply of services, so the 5% goods-rate notification did not apply. The order does not state the rate for works contracts, so the rate for this contract is not settled by this ruling.

    Who this affects

    EPC contractors and installers who supply and erect plant, machinery or systems at government research facilities, laboratories or test sites, where the equipment is fixed to the building or land.

    An example

    A contractor is hired by a state university to supply and install a cooling system for a research laboratory. The system is bolted to the building and commissioned on site. The contractor would ask whether the 5% goods rate can apply to the whole contract, and this ruling suggests that installation that makes equipment immovable may push the contract into works contract treatment.

    What you should do

    Do not assume the 5% goods rate applies to your contract because this one was taxed differently. A ruling binds only the company that asked and its own tax office, so it is not automatically the law for your business. If your contract has a similar scope, read the full order, check the rate with your tax advisor, and consider asking the authority for a ruling of your own.

    If you do nothing

    If you assume the 5% goods rate applies and your tax officer treats the contract as a works contract, you may be asked to pay the difference in tax, with interest. Penalties may also apply if the shortfall is found to be a mistake. Getting the classification right at the start avoids that dispute.

    The terms explained

    EPC contract
    An Engineering, Procurement and Construction contract, where one company designs, buys equipment for, and builds a project for the client.
    composite supply
    A supply where goods and services are naturally bundled together and supplied in conjunction, treated as one supply under GST.
    works contract
    A contract to build, install or erect something that becomes part of immovable property, which GST treats as a supply of services.
    advance ruling
    A written decision by a GST authority on a specific business's question about how a transaction will be taxed. It binds only that business and its own tax office.
    immovable property
    Property fixed to land or a building, such as a structure that is bolted or embedded in the ground and cannot be moved without damage.

    The ruling in detail

    Authority for Advance Ruling

    M/s. Tata Projects Limited

    Order No.17 / AAR / 2019 dated 16.04.2019 · Tamil Nadu

    Questions before the authority

    • Whether supply of Engineering, Procurement and Construction (EPC) contract for establishment of Fluids Servicing System, where both goods and services are supplied, can be construed to be a composite supply in terms of Section 2(30) of the CGST Act, 2017.
    • If yes, whether the principal supply, 'Establishment of Fluids Servicing System (FSS)', can be taxable at 5% GST under Notification No.45/2017-Central Tax (Rate) dated 14/11/2017.
    • If the principal supply is taxable at 5%, whether the entire transaction in the contract is taxed at the rate applicable to the principal supply.

    Facts

    ISRO Propulsion Complex, Mahendragiri awarded Tata Projects Limited a contract for establishment of the Fluids Servicing System of the Semi Cryo Integrated Engine Test Facility, with a duration of 27 months. The scope covers review of ISRO's process design, detailed engineering, procurement and supply of equipment, pipes and instruments, shop fabrication, site erection, minor civil works, and commissioning. The applicant states that material supply makes up about 86 per cent of the contract value, and that major civil works are done by ISRO.

    Ruling

    QuestionWhat the authority ruled
    Whether the EPC contract for establishment of FSS, supplying both goods and services, is a composite supply under s.2(30) CGST ActYes. The EPC contract is a composite supply in terms of Section 2(30) of the CGST and TNGST Acts, 2017.
    The authority goes on to hold that the same contract is also a works contract, so the composite-supply finding is not the final classification.
    Whether the principal supply can be taxed at 5% under Notification No.45/2017-CT(Rate) dated 14.11.2017No. The supply is a works contract under Section 2(119), so Notification 45/2017-CT(Rate) and G.O.(Ms) No.161 dated 14.11.2017 are not applicable.
    The authority reasons that the works contract is treated as a supply of services under Schedule II, so the concessional goods rate is not available.
    Whether the entire transaction is taxed at the rate applicable to the principal supplyNo. The complete transaction is taxable at the rate applicable to works contract supply. The percentage is not stated in the order.
    The rate applicable to works contract supply is not legible or stated in the order text.

    The authority held that the EPC contract is a composite supply under Section 2(30) of the CGST and TNGST Acts. It then held that the same contract is a works contract under Section 2(119), so Notification No.45/2017-Central Tax (Rate) and the corresponding Tamil Nadu notification do not apply. The complete transaction is taxable at the rate applicable to works contract supply, and the order does not state that rate.

    Reasoning

    The authority accepted that the goods and services were naturally bundled and supplied in conjunction, so the contract met the composite supply test in Section 2(30). It then found that erection and commissioning fix the FSS to the test-bed facility, which is embedded in earth, and so the system becomes immovable property. Relying on the Supreme Court decision in Commissioner of C.Ex. Ahmedabad v. Solid & Correct Engineering Works, it treated the contract as a works contract under Section 2(119). Under paragraph 6(a) of Schedule II, works contracts are treated as a supply of services, so the goods-rate notification could not apply. The order does not reconcile the composite-supply finding with the works-contract classification beyond this.

    Provisions relied on

    • Section 2(30) of the CGST Act, 2017 (composite supply)
    • Section 2(119) of the CGST Act, 2017 (works contract)
    • Schedule II, paragraph 6(a) of the CGST Act, 2017
    • Notification No.45/2017-Central Tax (Rate) dated 14.11.2017, Sl. No.1
    • G.O.(Ms) No.161 dated 14.11.2017 (Tamil Nadu SGST notification)
    • Commissioner of C.Ex. Ahmedabad v. Solid & Correct Engineering Works, 2010 (252) E.L.T. 481 (S.C.)

    For the practitioner

    This ruling is useful for EPC contractors supplying and erecting plant at government research facilities, because it confirms that erection and commissioning that make equipment immovable push the contract into works contract treatment. It also shows that the 5% goods-rate exemption for public-funded research institutions will not carry over to a works contract. The ruling binds only the applicant and does not set the works contract rate, which the order does not state. It also does not resolve the composite-supply point in a way that a practitioner can rely on without reading the reasoning in full.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/AAR/tn-17-aar-2019-tata_projects_ltd.pdf

    Legibility of the scan, as read: high.

    Prepared 02-11-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Advance rulings (AAR)

    All Advance rulings (AAR) →

    Does this ruling mean my equipment supply to a government lab is taxed as a works contract?

    Not automatically. The authority decided this for Tata Projects Limited's contract, based on the facts there, including that the equipment was erected and commissioned in a way that fixed it to the test facility. Your contract needs its own review against those facts.

    Can I claim the 5% goods rate under Notification No.45/2017 for my contract?

    This ruling says that where the contract is a works contract, the 5% goods-rate notification does not apply. Whether your contract is a works contract depends on its scope, especially whether installation makes the equipment immovable property.

    What GST rate applies to a works contract under this ruling?

    The order does not state the rate. It only says the complete transaction is taxed at the rate applicable to works contract supply, so you will need to check the current rate separately.

    Is this ruling binding on tax officers in other states?

    No. An advance ruling binds only the company that asked and its own tax office. Officers in other states are not required to follow it, though they may consider the reasoning.

    What if my tax officer disagrees with how I classified the contract?