The short version
- Sterlite Technologies asked whether its BSNL network setup contract is a works contract under GST.
- The authority held it is a composite supply of works contract under Section 2(119) of the CGST Act.
- The 12% concessional rate under entry 3(vi)(a) of Notification 11/2017 was refused.
- The applicable rate is 18% GST for the contract as described.
- The ruling binds only Sterlite Technologies and its own tax office.
In short
Sterlite Technologies Limited, a Maharashtra maker of optical fibre cable, asked the GST advance ruling authority how to tax its contract with BSNL. Under that contract it supplies materials and services to build a countrywide IP/MPLS network for the Indian Navy, including civil works, equipment installation and operator training. The question was whether this counts as a works contract, and whether the lower 12% rate for 'original works' applies.
What has changed
How it worked before
The position was unsettled. Contractors on turnkey government network or telecom projects were not sure whether the 12% concessional rate for 'original works' applied, or whether their contracts were works contracts at all. This ruling is the first clear answer on that point for this kind of contract, and it has been decided only for one applicant.
What has changed
The authority held that the network setup is a composite supply of works contract, taxable at 18% GST. It refused the 12% rate because Sterlite installs equipment that it supplies itself, so its activity is primarily the supply of goods, not original works. In practice, a contractor that supplies and installs its own equipment under a similar government project should not assume the 12% rate applies. The authority did not answer the second question, about whether the contract could be treated as a composite supply with a principal supply, so that point remains open.
Who this affects
Telecom equipment makers and contractors who supply and install their own equipment under turnkey network projects for government bodies, such as BSNL, railways or defence agencies, and who are unsure whether their contract is a works contract and what GST rate applies.
An example
A small firm supplies and installs CCTV and networking equipment for a state government building under a single contract that includes civil cabling work. It supplies most of the hardware itself and asks whether the 12% rate for original works applies. Based on this ruling, the authority would likely treat the firm's work as supply of goods with installation, which points to 18%. The firm should not rely on this order alone, since it applies only to Sterlite Technologies.
What you should do
Check whether your contract includes both supply of goods and installation or construction work, and whether you supply most of the equipment yourself. If it does, read this ruling closely and discuss the 18% rate with your tax adviser before billing at 12%. This ruling binds only Sterlite Technologies and its tax office, so it is not automatically the law for your business. An advance ruling can be appealed to the Maharashtra Appellate Authority for Advance Ruling, so the position may still change.
If you do nothing
If you bill at 12% on the assumption that this ruling covers your contract, a tax officer may treat the difference as unpaid GST. You may then have to pay the shortfall with interest and possibly a penalty. The safer course is to take the rate question to your tax officer or adviser before filing, not after.
The terms explained
- works contract
- A contract where you provide both goods and services to create or change immovable property, such as a building, road or installed network. Section 2(119) of the CGST Act defines it.
- composite supply
- A supply made up of more than one good or service that is bundled together, where one of them is the main part. Section 2(30) of the CGST Act defines it.
- original works
- A category of construction and civil work that attracts a lower GST rate under Notification 11/2017. The ruling refused this category for a contractor who supplies the equipment it installs.
- advance ruling
- A decision a GST authority gives before a transaction, on a question a business asks about its own case. It binds only the business that asked and its own tax office.
The ruling in detail
Authority for Advance Ruling
Sterlite Technologies Limited
NO.GST-ARA-106/2018-19/B-34, Mumbai, dated 28.03.2019 · Maharashtra
Questions before the authority
- Whether the supply of goods or services for 'setting up of network' would qualify as 'works contract' as defined in Section 2(119) of the CGST Act?
- If supplies contemplated under the contract with BSNL are not treated as works contract, can they continue to qualify as a composite supply, and if so, what is the principal supply?
- What is the rate of tax applicable to the supplies made under the contract?
Facts
The applicant manufactures optical fibre cable and telecom products. Under a contract with BSNL, which holds a tender from the Indian Navy for a countrywide IP/MPLS converged network, it must supply materials and services to set up the network. The scope includes civil construction of buildings, power rooms and roads, installation and commissioning of equipment, satellite connectivity vehicles, and operator training.
Ruling
| Question | What the authority ruled |
|---|---|
| Does setting up the network qualify as a works contract under Section 2(119) of the CGST Act? | Yes. It qualifies as a composite supply of works contract as defined in clause (119) of Section 2 of the CGST Act, 2017. The order rests the taxable classification on clause (ii) of Section 5 of Notification 11/2017-CT (Rate), as amended, and not on the 'original works' limb of entry 3(vi)(a). |
| If not a works contract, can the supplies be a composite supply, and what is the principal supply? | Not answered. The authority treated this as unnecessary given its answer to the first question. |
| What is the rate of tax applicable to the supplies under the contract? | 18% GST. The applicant had sought 12% (6% CGST and 6% SGST) under entry 3(vi)(a) of Notification 11/2017-CT (Rate). The authority held the contract is not 'original works' because the equipment is supplied by the applicant itself. |
The authority held that the supply for setting up the network is a composite supply of works contract as defined in clause (119) of Section 2 of the CGST Act. It did not separately answer the second question, because the first was answered in the affirmative. It held that the applicable rate is **18% GST**, not the 12% rate the applicant had sought under entry 3(vi)(a) of Notification 11/2017.
Reasoning
The authority found that the contract involves supply of both goods and services, so it is a composite supply of works contract under Section 2(119) read with Section 2(30) of the CGST Act. It held that the work is not 'original works' under entry 3(vi)(a) of Notification 11/2017, because the applicant installs equipment that it supplies itself, so its activity is primarily the supply of goods. It relied on the definition of 'original works' in Notification 12/2017 and in the CPWD Manual, and on Section 3(26) of the General Clauses Act, 1897 for 'immovable property'. Because the contract does not fall within clauses (i) to (xii) of Section 5, except clause (ii), it attracts 18% GST.
Provisions relied on
- Section 2(119) of the CGST Act, 2017 (works contract)
- Section 2(30) of the CGST Act, 2017 (composite supply)
- Notification No. 11/2017-CT (Rate), entry 3(vi)(a) and Section 5, clause (ii), as amended
- Notification No. 12/2017-CT (Rate), definition of 'original works' (referred to by the applicant)
- CPWD Manual 2014, para 1.3.1 (definition of 'original works')
- Section 3(26) of the General Clauses Act, 1897 (definition of 'immovable property')
For the practitioner
The order is useful for turnkey network or telecom projects with government entities, as it shows the authority treating such a contract as a composite supply of works contract taxable at 18%. A contractor seeking the 12% concessional rate under 'original works' should note that the authority refused it where the contractor supplies the equipment it installs. The order does not decide the second question, so the composite-supply analysis under Section 2(30) remains untested for this type of contract. It is an advance ruling binding only on the applicant, and the bottom of the order notes an appeal lies to the Maharashtra Appellate Authority for Advance Ruling.
Source
This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.
Original order: https://www.gstcouncil.gov.in/sites/default/files/AAR/ara_order_106_2018_maharashtra_sterlite_tech._ltd.pdf
Legibility of the scan, as read: medium.
Prepared 01-11-2026.
About Patron Accounting LLP
Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.
Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.
We operate from five offices and serve clients across the rest of India remotely:
- Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
- Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
- Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
- Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
- Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009
If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.