    Split solar plant contracts treated as one works contract under GST

    Karnataka's advance ruling says a split solar plant contract is one GST works contract, and standalone solar parts can get the 5% rate.

    Ruling
    Advance Ruling No. KAR ADRG 120/2019, dated 30.09.2019 (the listing's reference KAR/AAR/120/2019-20 does not match the order's own numbering)
    Dated
    Authority
    Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. A solar plant contract split into goods and services is still one works contract under GST.
    2. Before 1 January 2019, the split did not allow separate 5% and 18% rates.
    3. From 1 January 2019, goods and services are valued separately under the amended entries.
    4. Standalone solar parts can get 5% if they are Chapter 84 or 85 items used in a solar power generating system.
    5. The 5% rate reaches sub-contractors only where the sub-contract is for supply of goods.

    In short

    In order KAR/AAR/120/2019-20 dated 30.09.2019, the Karnataka Authority for Advance Ruling (AAR) looked at how GST applies when a solar power plant is built under two separate contracts, one for goods and one for services. The company asked whether each side could be taxed at its own rate, 5% for solar goods and 18% for services. It also asked whether parts sold on their own, and work passed to sub-contractors, could get the same 5% rate.

    What has changed

    How it worked before

    Many developers and EPC contractors assumed that splitting a solar plant job into a goods contract and a services contract allowed each part to be taxed at its own rate. The position before this ruling was not settled, and the ruling does not say what the pre-2019 services rate was.

    What has changed

    The Authority held that a split EPC contract is still one works contract under section 2(119) of the CGST Act, so the split does not change how it is taxed. For the period up to 31 December 2018, it is taxed as a works contract. From 1 January 2019, goods and services are taxed on values worked out separately under the amended entries. Standalone solar parts can get the 5% rate if they are Chapter 84 or 85 items that go into a solar power generating system. For sub-contractors, the 5% rate applies only where the sub-contract is for supply of goods.

    Who this affects

    Solar plant developers, EPC contractors who take on solar projects, and suppliers of PV modules, inverters or other solar parts who sell them on their own.

    An example

    A rooftop developer in Pune signs one contract with a supplier for PV modules and inverters and a separate contract with a installer for mounting and commissioning. The developer asks whether the goods can be taxed at 5% and the installation at 18%. Based on this ruling, the two contracts may be treated as one works contract, so the separate rates may not hold, at least for the period before 2019. The developer should not assume the same answer without checking the position for its own contracts and dates.

    What you should do

    Check whether your contracts are split into goods and services, and whether the work is really one project. Confirm that any parts you sell separately are Chapter 84 or 85 items that go into a solar power generating system before claiming 5%. Note that this ruling binds only Solarsys Non-conventional Energy Private Limited and its own tax office. It is not automatically the law for your business, so ask a tax adviser or seek a ruling of your own if your facts differ.

    If you do nothing

    If you assume the split-contract approach is safe and the tax officer treats the contract as one works contract, you may owe tax at a different rate than you charged or paid. The difference can come with interest and penalties. Relying on a ruling that does not cover your facts can also make it harder to defend your position on audit.

    The terms explained

    works contract
    A contract where you supply both materials and labour to build, fit or install something on land, such as a plant. GST treats it as one contract even if it is written as separate parts.
    EPC contract
    An engineering, procurement and construction contract, where one contractor designs, supplies equipment for and builds a project. Here the EPC contract was split into a goods contract and a services contract.
    Chapter 84 or 85
    The chapters of India's customs tariff that cover machinery and electrical goods. Only items under these chapters that go into a solar power generating system qualify for the 5% rate in this ruling.
    PV modules
    Photovoltaic panels that convert sunlight into electricity. They are the main part of a solar power plant.
    advance ruling
    A decision by a tax authority on how tax applies to a specific business's proposed transaction. It binds only the business that asked and its own tax office.

    The ruling in detail

    Authority for Advance Ruling

    M/s Solarys Non-Conventional Energy Private Limited (printed as 'Solarys' in the order)

    Advance Ruling No. KAR ADRG 120/2019, dated 30.09.2019 (the listing's reference KAR/AAR/120/2019-20 does not match the order's own numbering) · Karnataka

    Questions before the authority

    • Whether, where goods and services for a solar power plant are contracted separately, the goods are taxable as 'Solar Power Generating System' at 5% and the services at 18%.
    • Whether parts supplied on a standalone basis (where PV modules are supplied separately) are eligible for the concessional 5% rate as parts of a solar power generating system.
    • Whether the concessional 5% rate for solar power generating systems and their parts is available to sub-contractors.

    Facts

    The applicant sets up solar power plants and enters into two separate contracts with EPC contractors, one for supply of goods (including PV modules, inverters, transformers and cables) and one for services (civil works, erection, commissioning and testing). In some arrangements the developer procures PV modules itself and awards only the balance of goods to the EPC contractor. The EPC contractors may further sub-contract civil works and supplies.

    Ruling

    QuestionWhat the authority ruled
    Q1: Separate goods and services contracts for a solar plant, taxed at 5% goods and 18% servicesNot as asked. The EPC contract is a works contract. Up to 31.12.2018 it is taxed as a works contract. From 01.01.2019 values are taken separately for goods (entry 234, 5%) and services (entry 38, shown as 9% in the order's table).
    The order states that the vivisection into two contracts does not alter the works contract character. The services rate for the pre-2019 period is not stated as a percentage in the ruling; 18% is not the answer given.
    Q2: Standalone parts (where PV modules are supplied separately) eligible for 5% as parts of a solar power generating systemYes, 5% under entry 234 of Notification No. 1/2017-Integrated Tax (Rate) (Serial No. 234 of Schedule I).
    Applies to goods under Chapter 84 or 85 that are renewable energy devices or parts for their manufacture, and only if they go into the manufacture of the solar power generating system.
    Q3: Concessional 5% available to sub-contractorsYes, 5% where the sub-contract is only for supply of goods. If the entire EPC contract is sub-contracted, the rate is the same as that applicable to the contractor, as ruled under Q1.
    The entry does not distinguish between contractor and sub-contractor supplies.

    The Authority held that the EPC contract, though split into goods and services contracts, is a single works contract under section 2(119) of the CGST Act, so the artificial division does not change its nature. For the period up to 31.12.2018 it is taxed as a works contract; from 01.01.2019 it is taxed on values worked out separately for goods and services under the amended entries. Parts supplied standalone are eligible for 5% if they fall under Chapter 84 or 85 and go into the manufacture of a solar power generating system, and the 5% benefit extends to sub-contractors only where the sub-contract is for supply of goods.

    Reasoning

    The Authority examined the EPC arrangement as a whole and found that the supply of goods and services is so intricately linked that it cannot be separated, so the contract is a works contract under section 2(119) of the CGST Act. It relied on the definition's reference to immovable property and the permanence of the plant. For goods, it read entry 234 of Notification No. 1/2017-Integrated Tax (Rate) as taxing renewable energy devices and parts for their manufacture at 5%, limited to Chapter 84 or 85 items that go into a solar power generating system. For the post-2018 position it applied entry 38 introduced by Notification 27/2018 and the explanation linking it to entry 234. On sub-contractors it held that entry 234 does not distinguish between contractor and sub-contractor supplies.

    Provisions relied on

    • Section 2(119) of the CGST Act, 2017 (definition of works contract)
    • Notification No. 1/2017-Integrated Tax (Rate), Serial No. 234 of Schedule I (5%, renewable energy devices and parts)
    • Notification No. 11/2017-Central Tax (Rate), entry 3(ii) as cited in the ruling (printed as '11/2019' in the ruling; the number is not reliably legible)
    • Notification No. 11/2017-Central Tax (Rate), entry 38 as inserted by Notification No. 27/2018-Central Tax (Rate) dated 31.12.2018, effective 01.01.2019
    • Notification No. 24/2018-Central Tax (Rate) dated 31.12.2018 (amendment to entry 234)

    For the practitioner

    This order is useful for the proposition that a split EPC contract for a solar plant may be treated as a single works contract, which defeats separate 5% and 18% treatment before 2019. It also supports 5% on standalone solar parts under Chapter 84 or 85 and on sub-contracts limited to goods. It does not settle the exact pre-2019 services rate, the treatment of items outside Chapter 84 or 85, or how the 2019 entry 38 values are to be worked out in practice, and it applies only to the applicant.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/AAR/kar_aar_120_2019_30.09.2019_sncepl.pdf

    Legibility of the scan, as read: medium.

    Prepared 12-11-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Advance rulings (AAR)

    All Advance rulings (AAR) →

    Does this ruling mean I can split my solar contract and pay 5% on goods and 18% on services?

    No, not on the strength of this ruling. The Authority held that a split EPC contract is still one works contract, so the split does not change its treatment. For dates from 1 January 2019, the goods and services are valued separately under the amended entries, which is a different position.

    Is this ruling binding on the whole of Karnataka or on other states?

    No. The ruling binds only Solarsys Non-conventional Energy Private Limited and its own tax office. Other businesses and other states are not bound by it, although they may read it to see how the authority thinks.

    Can I claim the 5% rate on solar PV modules I sell on their own?

    The Authority held that standalone parts are eligible for 5% if they fall under Chapter 84 or 85 and go into the manufacture of a solar power generating system. Check that your product meets both conditions before applying the rate.

    Does the 5% rate apply to my sub-contractor's work?

    The ruling says the 5% benefit extends to sub-contractors only where the sub-contract is for supply of goods. A sub-contract for services, such as civil works or erection, does not get the same benefit under this ruling.

    What if my tax officer disagrees with this ruling?

    A tax officer is not bound by an advance ruling given to another business. If your facts are different or the officer takes a different view, you may need to argue your position or seek your own advance ruling. Getting professional advice early helps.