    Advance rulings (AAR) Maharashtra

    Works contractor for affordable housing can claim 12% GST, Advance Ruling GST-ARA-99 Maharashtra 2019

    Maharashtra's advance ruling authority held a works contractor building low cost houses for an affordable housing project can claim the 12% GST rate, but only for units up to 60 square metres.

    Ruling
    NO.GST-ARA-99/2018-19/B-31, Mumbai, dated 20.03.2019
    Dated
    Authority
    Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. The company asked if a works contractor, not the developer, can claim the 12% GST rate.
    2. The authority said yes, because the concession attaches to the supply, not the supplier.
    3. The project must use at least 50% of FSI for units with carpet area up to 60 sq. mts.
    4. Commercial units do not qualify and stay at the normal rate.
    5. The benefit applies only to supplies made after 25.01.2018.

    In short

    A GST advance ruling (a decision by a tax authority on one business's question) asked whether a civil contractor building homes for a developer can charge the reduced 12% GST rate for affordable housing. The contractor was building for Puranik Builders Limited at Nerul, Navi Mumbai, under two contracts, one covering only small residential units and one mixing residential and ground-floor commercial units.

    What has changed

    How it worked before

    The order does not record what contractors assumed before it. Its reasoning relies on a 2018 CBEC clarification, a GST Council recommendation and an earlier advance ruling, which suggests the question was not settled for works contractors.

    What has changed

    The authority held that the 12% rate in Notification 01/2018-Central Tax (Rate) is a supply-based entry, so a contractor supplying works contract services for low cost houses in an affordable housing project can claim it, not just the developer. The authority accepted the builder's self-determination backed by an architect's certificate and the local tax office's concurrence that the project met the test. The concession covers only residential units with carpet area up to 60 sq. mts., not commercial units, and only supplies after 25.01.2018.

    Who this affects

    Civil contractors and works contractors building residential projects for a developer, especially where the project includes both small flats and some commercial space.

    An example

    A contractor builds 200 flats for a developer, all under 60 sq. mts., with the project using 98% of FSI for such units and a small shop at ground level. The contractor would ask whether the 12% rate applies to the whole contract. The ruling suggests the flats may qualify for 12%, while the shop would be taxed at the normal rate, though the ruling did not settle how a mixed contract is split.

    What you should do

    Check whether your project meets the same test: at least half the floor space index used for units up to 60 sq. mts. carpet area, with commercial units taxed separately. Keep the architect's certificate and the developer's self-determination on file. This ruling binds only Puranik Construction Pvt. Ltd. and its own tax office, so it is not automatically law for your business; ask your tax adviser whether your facts match.

    If you do nothing

    If you assume this ruling covers you and it does not, your tax officer may charge the normal GST rate on the difference, plus interest and possibly penalty. Charging 12% on commercial units or on a project that fails the 50% test would be the most likely error. The ruling itself gives no protection to anyone other than the applicant.

    The terms explained

    Advance ruling
    A decision by a tax authority, given in advance, on how the law applies to one business's specific question. It binds only that business and its own tax office.
    Affordable Housing Project (AHP)
    A housing project where at least half the floor space is used for homes with carpet area up to 60 square metres, as defined by the central government.
    Floor space index (FSI)
    The ratio of the total built-up area allowed on a plot to the size of the plot. Here it is used to measure how much of the project's space goes to small homes.
    Carpet area
    The usable area inside a flat, excluding walls, balconies and common spaces.
    Works contract
    A contract where a contractor builds or constructs something for a client, supplying both labour and materials for the job.

    The ruling in detail

    Authority for Advance Ruling

    Puranik Construction Pvt. Ltd.

    NO.GST-ARA-99/2018-19/B-31, Mumbai, dated 20.03.2019 · Maharashtra

    Questions before the authority

    • Whether the applicant, a works contractor supplying civil construction services to a developer for a Low Cost House project in an Affordable Housing Project, is eligible for the concessional GST rate of 12% under Notification 01/2018-Central Tax (Rate) dated 25.01.2018, which provides for a concessional rate on works contract services for original works pertaining to construction of a Low Cost House in an AHP.

    Facts

    Puranik Construction Pvt. Ltd. is a civil contractor that proposed to enter into two civil construction contracts with Puranik Builders Limited for a residential project at Nerul, Navi Mumbai. Contract I covers 109 buildings with only residential units of carpet area up to 60 sq. mts., and Contract II covers 26 buildings with residential units plus commercial units on the ground floor. The applicant contended that about 98.5% of the FSI would be used for units up to 60 sq. mts., so the project qualifies as an AHP.

    Ruling

    QuestionWhat the authority ruled
    Eligibility of the concessional GST rate under Notification 01/2018-Central Tax (Rate) dated 25.01.2018 for works contract services for construction of Low Cost Houses in an AHP**Eligible for concessional rate of 12%**
    Applies only to residential units of carpet area up to 60 sq. mts. in the project; not available for commercial units.

    The applicant is eligible for the concessional GST rate of 12% (6% CGST and 6% SGST) for the project, as the facts stand. The concession applies only to residential units of carpet area up to 60 sq. mts., and not to commercial units.

    Reasoning

    The Authority held that the Notification entry (Sr. No. 3, item (v), sub-item (da)) is a supply-based entry and does not restrict the concession to developers, so a contractor supplying works contract services for low cost houses in an AHP may also claim it. Relying on the Department of Economic Affairs notification F. No. 13/6/2009-INF dated 30.03.2017, an AHP is a project using at least 50% of FAR/FSI for dwelling units with carpet area not more than 60 sq. mts., and the Authority accepted the applicant's Architect's certificate and the jurisdictional office's concurrence on that basis. The Authority followed its own earlier ruling in Prajapati Developers, the GST Council's 25th meeting recommendation, and the CBEC clarification F. No. 354/52/2018-TRU dated 07.05.2018, under which self-determination by the builder or developer suffices without certificate from any authority. The benefit was limited to supplies after 25.01.2018 and to residential units up to 60 sq. mts.

    Provisions relied on

    • Notification 01/2018-Central Tax (Rate) dated 25.01.2018, Sr. No. 3, item (v), sub-item (da)
    • Notification No. 11/2017 (Central Tax (Rate)), as amended, Heading 9954 (as stated in the order)
    • Notification F. No. 13/6/2009-INF dated 30.03.2017, Department of Economic Affairs (definition of Affordable Housing)
    • Section 97 and Section 98 of the CGST Act, 2017 and the MGST Act, 2017
    • Section 171 of the CGST Act, 2017 (anti-profiteering), referred to in the GST Council recommendation
    • CBEC clarification F. No. 354/52/2018-TRU dated 07.05.2018
    • Prajapati Developers advance ruling (TS-404-AAR-2018-NT), as relied on by the Authority

    For the practitioner

    A works contractor to a developer of an AHP can rely on this ruling to claim the 12% rate for low cost house construction, provided the project meets the 50% FSI and 60 sq. mts. carpet area test. The ruling does not decide the rate for commercial units, which remain at the normal rate, and it does not settle the position for supplies made before 25.01.2018. It also does not resolve how the 12% rate should be applied to the composite contract, since the ruling was not expressly tested against that issue.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/AAR/ara_order_99_2018_maharashtra_pcpl.pdf

    Legibility of the scan, as read: high.

    Prepared 01-11-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Advance rulings (AAR)

    All Advance rulings (AAR) →

    Does this mean any contractor building affordable housing can charge 12% GST?

    Not automatically. The authority held that the concession can apply to a contractor, but only if the project meets the 50% FSI test and the 60 sq. mts. carpet area limit. Check your own project against both conditions.

    Is this ruling binding on my state or my tax office?

    No. An advance ruling binds only the business that asked and its own tax office. It is persuasive for others, but it is not law for your business.

    Does the 12% rate apply to commercial units in the same project?

    No. The order says the concession applies only to residential units up to 60 sq. mts. Commercial units, such as shops on the ground floor, remain at the normal rate.

    What if my tax officer disagrees with the builder's self-determination?

    The ruling relied on the builder's self-determination backed by an architect's certificate and the local tax office's concurrence. If your officer takes a different view, you would need to argue your case on your own facts or seek your own advance ruling.

    Does this cover supplies made before 25.01.2018?

    No. The authority limited the benefit to supplies made after 25.01.2018, the date of the notification.