    Advance ruling: substation panel contracts taxed as goods at 18% GST

    Maharashtra's advance ruling authority held a substation panel and automation contract is goods supply, taxable at 18% GST, not works contract.

    Ruling
    NO.GST-ARA-83/2018-19/B-03, Mumbai dt. 08/01/2019 (the stamped date reads 08/01/2019)
    Dated
    Authority
    Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. The company asked whether its APTRANSCO panel contract was a works contract under GST.
    2. The authority said no: it is a composite supply where goods are the main part.
    3. Goods made up about 97.5% of the contract value.
    4. The whole contract was taxed at 18% under GST Tariff Heading 8537.
    5. The department's argument for a 28% rate was rejected.

    In short

    An advance ruling is a written answer from a GST tax authority to one business's question, given before the business acts. NR Energy Solutions India Pvt. Ltd. supplies relay and protection panels and a substation automation system to APTRANSCO under three turnkey purchase orders. The turnkey orders cover design, supply, installation, testing and commissioning, but the price lists the goods separately from the services. The question was whether this is a works contract, which is taxed differently, or a supply of goods, and at what GST rate.

    What has changed

    How it worked before

    The position was not settled. The company itself first charged GST at 28% on the goods, then issued credit notes and revised invoices at 18% under SAC 995461 after APTRANSCO amended the contract values. The department argued for 28%, so the tax treatment of such contracts was genuinely in dispute.

    What has changed

    The authority decided the contract is not a works contract, because the panels and automation system were not fixed to immovable property in a way that made them one. It treated the contract as a composite supply, where goods and services are naturally bundled and supplied together, with goods as the main supply. The whole contract is taxable at 18% under Heading 8537 of the GST Tariff, which covers boards, panels and consoles for electric control or distribution. In practice, a turnkey panel contract is billed as one supply of goods at 18%, rather than split into a works contract.

    Who this affects

    Manufacturers and suppliers of control panels, protection panels and substation automation systems who sign turnkey contracts covering supply, installation, testing and commissioning, where the goods make up most of the price.

    An example

    A company supplies control panels to a state power utility under one contract that prices the panels at 95% of the value and installation at 5%. The owner asks whether the whole contract can be billed at 18% as a composite supply of goods. This ruling suggests the answer may be yes where the goods are the main supply and the services are naturally bundled with them, but it is not a guarantee for this company until its own tax office or an advance ruling confirms the facts.

    What you should do

    Do not treat this ruling as law for your business. A ruling binds only the company that asked and its own tax office, so an officer in your state or for your contract is not bound by it. Compare your contract with this one: check whether the goods are the main part of the value, whether the equipment is fixed to land or a building, and what the services involve. If your facts differ, discuss your rate with your tax adviser, or consider applying for your own advance ruling. The ruling itself can be appealed to the Maharashtra Appellate Authority.

    If you do nothing

    If you assume this ruling covers your contract and it does not, a tax officer may treat your contract as a works contract or apply the 28% rate that the department argued for. You could then receive a demand for the tax difference, and possibly interest. Checking your own facts before you bill is far cheaper than correcting invoices later.

    The terms explained

    works contract
    A contract where a business builds, installs or repairs something fixed to land or a building, and is taxed as a service rather than as a sale of goods.
    composite supply
    A single supply made up of goods and services that are naturally bundled together, where one part (the principal supply) decides the tax treatment for the whole.
    advance ruling
    A written decision a GST tax authority gives on one business's question before the business acts. It binds only that business and its own tax office.
    turnkey contract
    A contract where the supplier delivers a finished, working system, covering design, supply, installation, testing and commissioning.
    GST Tariff Heading 8537
    The part of the GST rate list that covers boards, panels and consoles used to control or distribute electricity. The authority applied 18% to this heading for this contract.

    The ruling in detail

    Authority for Advance Ruling

    M/S NR Energy Solutions India Pvt Ltd

    NO.GST-ARA-83/2018-19/B-03, Mumbai dt. 08/01/2019 (the stamped date reads 08/01/2019) · Maharashtra

    Questions before the authority

    • Whether the transaction/contract with M/s APTRANSCO for relay and protection panels with substation automation system is in the nature of works contract services and therefore liable to GST @ 18% under HSN 995461.
    • If the answer to the above is in the negative, whether the said transaction is supply of goods, and if yes, at what rate of tax and under which HSN code.

    Facts

    The applicant, a manufacturer and supplier of electrical control panels and substation automation systems, holds three turnkey purchase orders from M/s APTRANSCO. The scope covers design, manufacture, supply, delivery, installation, testing and commissioning of relay and protection panels with a substation automation system at various substations. The POs price supply of materials separately from installation, testing and commissioning. The applicant first charged GST at 28% on the goods and later issued credit notes and revised invoices at 18% under SAC 995461, following APTRANSCO's amendment of the contract values.

    Ruling

    QuestionWhat the authority ruled
    Whether the contract with APTRANSCO is works contract services liable to GST @ 18% under HSN 995461Answered in the negative
    No immovable property was transferred in execution of the contract, so the Section 2(119) works contract definition was not met. The transaction is treated as composite supply.
    If not works contract, whether the transaction is supply of goods; if yes, rate and HSNComposite supply with goods as principal supply; entire transaction taxable at 18% under Heading 8537
    The goods are boards and panels equipped with two or more apparatus of heading 8535 or 8536, for electric control and distribution of electricity. Services are a minor component (about 2.5% of value).

    The authority answered the works contract question in the negative. It held that the transaction is a composite supply in which the principal supply is goods, and that the entire transaction is taxable at **18% GST under Heading 8537** of the GST Tariff. The department had argued for 28% under sub-heading 85372000, but the authority rejected that rate.

    Reasoning

    The authority held that the panels and automation system were not fixed to immovable property in a way that made the contract a works contract under Section 2(119), so the works contract characterisation failed. It then examined the three POs, which separately priced goods and services, and found that the goods and services were naturally bundled and supplied in conjunction with each other, bringing the transaction within the composite supply definition in Section 2(30). Goods formed about 97.5% of the value, so goods were the principal supply. Classifying the panels under Heading 8537 of the GST Tariff, the authority applied the 18% rate for the whole composite supply.

    Provisions relied on

    • Section 2(30) CGST Act, 2017 (composite supply)
    • Section 2(119) CGST Act, 2017 (works contract)
    • Schedule II, GST Act (works contract and construction entries, as referred to in the order without a specific entry number)
    • Heading 8537 of the GST Tariff (boards, panels and consoles for electric control or distribution)
    • Section 98 CGST Act / MGST Act (advance ruling)

    For the practitioner

    This ruling helps suppliers of substation control and protection panels who bundle supply with installation and commissioning, because it treats such turnkey contracts as a composite supply of goods taxable at 18% under Heading 8537. It does not settle the rate for other substation or EPC contracts where the value split, the mix of services, or the nature of the installed equipment differs. It also does not decide that every installed equipment contract is a composite supply, since the authority's conclusion rests on the absence of immovable property being transferred. The ruling binds only the applicant and is appealable to the Maharashtra Appellate Authority.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/AAR/ara_order_83_2018_maharashtra_nr_esipl.pdf

    Legibility of the scan, as read: high.

    Prepared 28-10-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Advance rulings (AAR)

    All Advance rulings (AAR) →

    Does this ruling mean I can charge 18% GST on my own panel contract?

    Not automatically. The ruling binds only NR Energy Solutions and its own tax office, and its decision depends on the facts of that contract. Compare your contract's value split, scope and the way the equipment is installed before applying the same rate.

    Why was the contract not treated as a works contract?

    The authority held that the panels and automation system were not fixed to immovable property in a way that made the contract a works contract. Because that test failed, the contract was examined as a composite supply instead.

    Why did the company first charge 28% and then 18%?

    The company first charged 28% on the goods. Later it issued credit notes and revised invoices at 18% under SAC 995461, after APTRANSCO amended the contract values.

    What if my tax officer disagrees with this approach?

    This ruling does not bind your tax officer, so the officer can take a different view. You can present this ruling and your own facts, seek your own advance ruling, or appeal through the usual route.

    Can the ruling be challenged?

    Yes. The ruling is appealable to the Maharashtra Appellate Authority, so the outcome could still change on appeal.