Talk to an expert

Tell us what you need and we will call you back.

🇮🇳 +91
    Advance rulings (AAR) Uttar Pradesh

    GST advance ruling UP_AAR_39: intelligent transport work on expressways taxed at 12%

    The UP authority ruled that intelligent transport system work on an expressway is a 12% GST works contract, under entry (iv).

    Ruling
    Order No. 39, dated 06.09.2019 (Authority for Advance Ruling, Uttar Pradesh; the ruling itself is dated in the proceedings as stated in the listing)
    Dated
    Authority
    Authority for Advance Ruling

    Read the original order (opens in a new tab)

    Add Patron Accounting as a preferred source on Google

    This page was written by Patron Accounting’s AI from the official release and reviewed before publishing. It explains the document in plain language. It is not the document itself. Where this page and the original differ, the original governs.

    The short version

    1. The joint venture is installing an intelligent transport system (ITS) for NHAI's Eastern Peripheral Expressway in Uttar Pradesh.
    2. The company asked whether this work falls under entry (vi) or entry (iv) of serial no. 3, at 12% GST.
    3. The authority decided it falls under entry (iv), at effective 12% (CGST and SGST).
    4. The reason: the ITS monitors the whole expressway, and the road opens to the public only once it works.
    5. The authority refused to decide the rate on the sub-contractor's services, as outside an advance ruling.

    In short

    The question was which GST rate applies when a joint venture installs an intelligent transport system (ITS) on a national expressway for NHAI. The company also asked what GST rate applies to the services its sub-contractor provides to it, and the authority did not answer that part.

    What has changed

    How it worked before

    The order does not describe a settled market view. Contractors doing electronic installations on roads had to choose between the two possible entries themselves, so the rate was open to argument.

    What has changed

    The authority held that installing ITS is part of building a road system for general public use, because the system is fixed to the road and the expressway cannot open without it. That places the work under entry (iv), taxed at effective 12%, rather than entry (vi). On the sub-contractor's rate, the authority gave no answer, so a main contractor still needs its own basis for that rate.

    Who this affects

    Contractors and sub-contractors installing traffic management, toll collection or other electronic systems on highways, expressways and toll plazas, and main contractors who pass such work to sub-contractors.

    An example

    A Lucknow firm installs CCTV and toll-lane sensors for a contractor building a state highway. It asks whether its work also falls under entry (iv) at 12%. If its system monitors the whole road and the road cannot open to traffic without it, this ruling suggests the answer is likely yes, but the firm should check those facts against its own contract.

    What you should do

    Do not treat this ruling as law for your business. It binds only the company that asked and the tax officers in its own jurisdiction, so for everyone else it is a persuasive guide. Compare your contract with the facts here, especially whether the road opens to the public only after your system works. For the rate on sub-contracted services, the ruling gives no answer, so get your own advance ruling or professional advice before filing.

    If you do nothing

    A tax officer is not bound by this ruling for your business, and may treat your work as taxable at a different rate. If you have already filed at 12% on that basis, you may be asked to pay the difference, and a dispute over the rate can take time and money to resolve.

    The terms explained

    works contract
    A contract to build, install, repair or otherwise work on property, where the main purpose is the work itself rather than the sale of goods.
    composite supply
    A single supply made of goods and services bundled together, such as installing equipment as part of a larger project, which is taxed as one supply.
    advance ruling
    A written decision by a tax authority on a business's own future or proposed transaction, which binds that business and its own tax officers only.
    intelligent transport system (ITS)
    Electronic systems on roads, such as traffic management, toll collection and digital communication, used to monitor and control traffic.

    The ruling in detail

    Authority for Advance Ruling

    M/s SICE-VAAAN Joint Venture, KLP0020504, Kalyspo Court, Jaypee Greens Wish Town, Sector 128, Gautam Buddha Nagar, Uttar Pradesh - 201304 (GSTN: 09ABAAS1466J1Z9)

    Order No. 39, dated 06.09.2019 (Authority for Advance Ruling, Uttar Pradesh; the ruling itself is dated in the proceedings as stated in the listing) · Uttar Pradesh

    Questions before the authority

    • Whether the composite supply of works contract provided by the applicant to NHAI shall be classified under entry (vi) to serial no. 3 of Notification No. 11/2017-CT(R) dated 28 June 2017 (CGST Rate Notification), read with the UP Notification dated 30 June 2017 (UPGST Rate Notification), and be liable to effective GST at 12% including CGST and UPGST?
    • Whether the composite supply of works contract provided by the applicant to NHAI shall also be classified under entry (iv) to serial no. 3 of the CGST Rate Notification, read with the UPGST Rate Notification, and be liable to effective GST at 12% including CGST and UPGST?
    • Whether the rate of GST on services rendered by the sub-contractor to the main contractor (the applicant) would be 12%, in view of entries (vi) and (iv) of the CGST Rate Notification read with the UPGST Rate Notification, or 18%?

    Facts

    The applicant is a joint venture between SICE, a Spanish company, and VAAAN Infra Private Limited, an Indian company. It holds a contract with NHAI for the development of the six-lane Eastern Peripheral Expressway through an Intelligent Transport System (ITS) installation project, covering the Advanced Traffic Management System, Toll Management System and Digital Transmission System. The scope is turnkey and includes design, supply, installation, testing and commissioning, together with four years of operation and maintenance of the ATMS. Under the general conditions of contract, plant and materials become NHAI's property on incorporation in the works or on payment, whichever is earlier.

    Ruling

    QuestionWhat the authority ruled
    Q I: classification of works contract to NHAI under entry (vi), serial 3Negative. Not classifiable under entry (vi) at 12%.
    The Authority held that entry (iv) is the more appropriate classification for ITS installation on the expressway.
    Q II: classification of works contract to NHAI under entry (iv), serial 3Yes. Covered by entry (iv); effective GST at 12% (CGST and SGST).
    The order states the rate as CGST and SGST, while the question refers to UPGST. Installation of ITS is part and parcel of construction of road transportation for use by the general public.
    Q III: GST rate on services of sub-contractor to the main contractor (applicant), 12% or 18%No ruling given.
    The question concerns input services supplied to the applicant by its sub-contractor, which the Authority held to be outside the scope of advance ruling under section 95(a).

    The Authority ruled that the applicant's supply does not fall under entry (vi) so as to attract 12% GST on that basis. It held that installation of ITS is part and parcel of the construction of a road transportation system for use by the general public, and that the supply is **more appropriately classified under entry (iv)** of serial no. 3, at effective 12% GST (CGST and SGST). The Authority declined to rule on the rate applicable to the sub-contractor's services, holding that this question is **outside the preview of the Advance Ruling**.

    Reasoning

    The Authority first held that ITS installation qualifies as a works contract under section 2(119) of the CGST Act, relying on the General Clauses Act definition of immovable property and the Supreme Court decision in Solid & Correct Engineering Works (2010) 252 ELT 481 (SC) on attachment to earth and permanence of annexation. It then found that the ITS system monitors the whole expressway and that the expressway opens to the public only once ITS is functioning. On that basis it treated ITS installation as part of constructing a road transportation system for general public use, which points to entry (iv) rather than entry (vi). The Authority then rejected the sub-contractor rate question under section 95(a), which limits advance rulings to supplies undertaken or proposed by the applicant.

    Provisions relied on

    • CGST Act 2017, section 2(30) (definition of composite supply)
    • CGST Act 2017, section 2(119) (definition of works contract)
    • CGST Act 2017, section 95(a) (definition of advance ruling)
    • CGST Act 2017, section 97(2) and section 100(1), as referred to in section 95(a)
    • Notification No. 11/2017-CT(R) dated 28 June 2017, serial no. 3, entries (iv) and (vi)
    • UP Notification No. KA.NI.-2-842/XI-9(47)/17-U.P. Act-1-2017-Order-(09)-2017 dated 30 June 2017 (UPGST Rate Notification)
    • General Clauses Act (cited in the order as 1987), definition of immovable property
    • Solid & Correct Engineering Works, (2010) 252 ELT 481 (SC)

    For the practitioner

    The order helps contractors executing ITS or similar intelligent transport installations on public roads, toll plazas and expressways. It indicates that such works, where the road is open to the general public, fall under entry (iv) at 12% rather than entry (vi). It does not decide the rate on sub-contracted services, so a main contractor still needs a separate basis for that rate. Under general advance-ruling law, the ruling binds only the applicant and the jurisdictional officers, so its value to other taxpayers is persuasive only.

    Source

    This is a summary prepared from the published order, which is a scanned document. It is a reading aid and not the authority: where the two differ, the order governs. Verify every provision against the original before relying on it.

    Original order: https://www.gstcouncil.gov.in/sites/default/files/AAR/up_aar_39_06.09.2019_svjv.pdf

    Legibility of the scan, as read: high.

    Prepared 07-11-2026.

    About Patron Accounting LLP

    Patron Accounting LLP is a CA and CS-led accounting and compliance firm that has been working with businesses across India since 2019. We handle the work that keeps a company correct with every department it answers to: day-to-day bookkeeping and accounting, GST registration and returns, income tax filing and assessments, TDS, payroll and PF/ESI, company and LLP incorporation, ROC and MCA compliance, statutory and internal audit, physical stock and inventory audits, trademark and other registrations, and the certificates and reports that banks, buyers and regulators ask for.

    Our clients range from a first proprietorship registering for GST to established companies running operations across several states. Much of our work is exactly this: reading what a department has published and telling a business, in plain terms, whether it changes anything for them.

    We operate from five offices and serve clients across the rest of India remotely:

    • Pune (HQ): RTC Silver, B4-708, Sai Satyam Park, Wagholi, Pune, Maharashtra 412207
    • Mumbai: 1st Floor, Rajshila Building, 104/597, Jagannath Shankar Seth Rd, Marine Lines, Mumbai 400002
    • Delhi: First Floor, Plot No. C-134-A, A-1 Block, Qutub Vihar Phase-1, New Delhi 110071
    • Gurugram: 705, 7th Floor, ILD Trade Centre, Sohna Road, Sector 47, Gurugram 122018
    • Ahmedabad: Phoenix Tower, 1107, near Commerce Six Road, Drive In Road, Navrangpura, Ahmedabad, Gujarat 380009

    If anything on this page affects you and you would like somebody to look at your own position, we are glad to help. Call +91 94594 56700, write to sales@patronaccounting.com, or visit patronaccounting.com. The first conversation costs nothing.

    More in Advance rulings (AAR)

    All Advance rulings (AAR) →

    Does this ruling mean my ITS or traffic system work is automatically taxed at 12%?

    No. The ruling applies to the company that asked, and its reasoning depends on the facts there, such as the road opening to the public only once the system works. Compare your own contract and facts before relying on it.

    Is this ruling binding on tax officers in my state?

    No. The ruling binds only the company that asked and its own jurisdictional officers in Uttar Pradesh. For other businesses it is a persuasive guide, not binding law.

    What if my tax officer disagrees with this ruling?

    The officer is not bound by this ruling for your business, so you should set out your facts and the reasons clearly. Get professional advice before taking a position on your return, because the outcome depends on your own facts.

    Does the ruling say what rate my sub-contractor should charge me?

    No. The authority refused to rule on the sub-contractor's services, saying that question was outside the scope of an advance ruling. A main contractor still needs its own basis for that rate.